{"publisher":{"name":"MediaBias News","url":"https://mediabias.news","methodology":"https://mediabias.news/methodology","editorialPrinciples":"https://mediabias.news/editorial-principles","corrections":"https://mediabias.news/corrections"},"scoreGuide":{"trust":"How well corroborated and evidenced the source reporting is. 0-100, higher is better.","critic":"Craft quality of the source journalism: context, balance, fact vs comment. 0-100, higher is better.","hype":"How far the source presentation runs ahead of substance. 0-100, LOWER IS BETTER.","scope":"Scores assess the original reporting this article was written from, not the truth of the underlying event and not the quality of this write-up."},"assessmentGuide":{"type":"coverage-and-source-reporting-analysis","factCheck":{"status":"not-performed","note":"Media Bias News compares coverage and scores the source reporting. It does not currently publish a ClaimReview verdict on whether the underlying event or claim is true."},"sourceFactuality":{"note":"Factuality values describe published ratings of the outlets that covered the story. They are not a factuality verdict on this story or its claims."}},"story":{"id":"https://mediabias.news/politics/senator-hawley-seeks-halt-to-new-ai-data-center-construction","slug":"senator-hawley-seeks-halt-to-new-ai-data-center-construction","url":"https://mediabias.news/politics/senator-hawley-seeks-halt-to-new-ai-data-center-construction","title":"Senator Hawley seeks halt to new AI data center construction","subtitle":"The Republican proposal aims to protect households from rising electricity rates.","excerpt":"Senator Josh Hawley is calling for a nationwide moratorium on new AI data center construction. The proposal seeks to pause building until Congress enacts protections against household electricity rate increases.","category":"Politics","area":"United States","publishedAt":"2026-11-13T04:26:33.477Z","sourceReportedAt":"2026-11-12T22:36:02.000Z","updatedAt":"2026-11-13T04:26:33.477Z","readTime":"3 min read","scores":{"trust":62,"critic":85,"hype":30,"notes":{"trust":"Trust 62: Hawley named as source and at least two independent digests confirm his moratorium proposal.","critic":"Critic 85: explains why moratorium matters, separates facts, notes next steps, and provides clear naming.","hype":"Hype 30: mild emphasis in headlines, but body remains factual without clickbait."}},"tags":["#AIDataCenters","#JoshHawley","#Moratorium","#EnergyPolicy","#Congress"],"entities":["Josh Hawley","Senate","House of Representatives"],"body":[{"type":"key_takeaways","items":["Senator Josh Hawley has called for a nationwide moratorium on new AI data center construction.","The proposal aims to halt building until Congress establishes protections against rising household electricity rates.","Hawley is the first Republican senator to publicly support a nationwide data center moratorium.","The moratorium proposal has passed the House of Representatives but faces opposition in the Senate."]},{"type":"paragraph","text":"Senator Josh Hawley (R-MO) is advocating for a nationwide pause on the construction of new AI data centers. This proposal, which Hawley has put forward as a priority for Senate Republicans, seeks to halt new construction until Congress implements measures to protect households from potential increases in electricity rates. Hawley is noted as the first Republican senator to endorse such a nationwide moratorium."},{"type":"heading","text":"Disagreement on legislative progress"},{"type":"paragraph","text":"Reports differ on the current status of the moratorium proposal in Congress. TokenPost states the effort has passed the House but faces Senate opposition. Political Wire reports that the proposal has passed the House but faces opposition in the Senate. However, The Hill reports that Hawley is calling on the Senate to pass a moratorium before Republicans lose the majority, suggesting it has not yet passed the Senate."},{"type":"heading","text":"What the coverage left out"},{"type":"paragraph","text":"None of the right-rated digests mention that the moratorium proposal has passed the House of Representatives. None of the left-rated digests mention that the proposal faces opposition in the Senate."}],"basedOn":[{"sourceName":"DiarioBitcoin","url":"https://diariobitcoin.com/regulacion/josh-hawley-busca-frenar-los-centros-de-datos-y-reune-aliados-de-ambos-partidos","headline":"Josh Hawley Seeks to Stop Data Centers and Gather Allies From Both Parties","angle":"","publishedAt":"2026-11-14T02:10:46.000Z"},{"sourceName":"Newsweek","url":"https://newsweek.com/josh-hawleys-allies-on-data-center-bill-before-republicans-lose-majority-12713403","headline":"Who are Josh Hawley's allies in national data center moratorium? Inside push to halt AI","angle":"","publishedAt":"2026-11-13T21:37:22.000Z"},{"sourceName":"The Maine Wire","url":"https://themainewire.com/2026/11/hawley-pushes-national-data-center-moratorium-a-week-after-midterm-shellacking","headline":"Hawley Pushes National Data Center Moratorium A Week After Midterm Shellacking","angle":"","publishedAt":"2026-11-13T20:54:37.000Z"},{"sourceName":"techstrong.it","url":"https://techstrong.it/featured/voter-backlash-against-data-centers-reshapes-2026-midterms-sparks-tech-industry-reset","headline":"Voter Backlash Against Data Centers Reshapes 2026 Midterms, Sparks Tech Industry Reset","angle":"","publishedAt":"2026-11-13T19:08:31.000Z"},{"sourceName":"Fortune","url":"https://fortune.com/2026/11/13/voters-data-centers-ballot-measures-midterms","headline":"Voters restricted data centers in all but one of 41 local midterm ballot measures — by an average margin of 49 points","angle":"","publishedAt":"2026-11-13T16:06:01.000Z"},{"sourceName":"Moncloa","url":"https://moncloa.com/2026/11/13/hawley-moratoria-centros-datos-ia-3467002","headline":"Hawley Promotes a National Moratorium on AI Data Centers Following the Republican Electoral Debacle","angle":"","publishedAt":"2026-11-13T08:59:49.000Z"},{"sourceName":"🔔 The Liberty Daily","url":"https://thelibertydaily.com/hawley-pushes-national-data-center-moratorium-week-after","headline":"Hawley Pushes National Data Center Moratorium a Week After Midterm Shellacking","angle":"","publishedAt":"2026-11-13T07:00:53.000Z"},{"sourceName":"tonyskansascity.com","url":"https://tonyskansascity.com/2026/11/show-me-hawley-help-against-downtown.html","headline":"Show-Me Hawley Help Against Downtown Kansas City Data Center","angle":"","publishedAt":"2026-11-13T02:16:00.000Z"},{"sourceName":"Decrypt","url":"https://decrypt.co/383206/republican-senator-freeze-ai-data-center-boom-congress-pushes-expand","headline":"Republican Senator Wants to Freeze AI Data Center Boom as Congress Pushes to Expand It","angle":"","publishedAt":"2026-11-12T22:36:02.000Z"},{"sourceName":"The Daily Caller","url":"https://dailycaller.com/2026/11/12/josh-hawley-national-data-center-moratorium-senate-republicans-midterms","headline":"First GOP Senator Pushes National Data Center Freeze — A Week After Midterm Shellacking","angle":"","publishedAt":"2026-11-12T19:04:16.000Z"},{"sourceName":"thedailybs.com","url":"https://thedailybs.com/2026/11/12/hawley-pushes-national-data-center-moratorium-a-week-after-midterm-shellacking","headline":"Hawley pushes national data center moratorium a week after midterm shellacking - The Daily Bo Snerdley","angle":"","publishedAt":"2026-11-12T19:02:54.000Z"},{"sourceName":"The Lever","url":"https://levernews.com/voters-are-rejecting-data-centers-now-so-is-josh-hawley","headline":"Voters Are Rejecting Data Centers — Now So Is Josh Hawley","angle":"","publishedAt":"2026-11-12T13:50:32.000Z"},{"sourceName":"KSNV","url":"https://news3lv.com/news/connect-to-congress/hawley-backs-data-center-moratorium-as-washington-weighs-new-restrictions-artificial-intelligence-midterm-elections-electricity-water-usage","headline":"Hawley backs data center moratorium as Washington weighs new restrictions","angle":"","publishedAt":"2026-11-12T12:31:24.000Z"},{"sourceName":"Fox 17","url":"https://fox17.com/news/nation-world/hawley-backs-data-center-moratorium-as-washington-weighs-new-restrictions-artificial-intelligence-midterm-elections-electricity-water-usage","headline":"Hawley backs data center moratorium as Washington weighs new restrictions","angle":"","publishedAt":"2026-11-12T12:31:24.000Z"},{"sourceName":"WCHS","url":"https://wchstv.com/news/nation-world/hawley-backs-data-center-moratorium-as-washington-weighs-new-restrictions-artificial-intelligence-midterm-elections-electricity-water-usage","headline":"Hawley backs data center moratorium as Washington weighs new restrictions","angle":"","publishedAt":"2026-11-12T12:31:24.000Z"},{"sourceName":"WHP","url":"https://local21news.com/news/nation-world/hawley-backs-data-center-moratorium-as-washington-weighs-new-restrictions-artificial-intelligence-midterm-elections-electricity-water-usage","headline":"Hawley backs data center moratorium as Washington weighs new restrictions","angle":"","publishedAt":"2026-11-12T12:31:24.000Z"},{"sourceName":"WLUK","url":"https://fox11online.com/news/nation-world/hawley-backs-data-center-moratorium-as-washington-weighs-new-restrictions-artificial-intelligence-midterm-elections-electricity-water-usage","headline":"Hawley backs data center moratorium as Washington weighs new restrictions","angle":"","publishedAt":"2026-11-12T12:31:24.000Z"},{"sourceName":"CBS Austin","url":"https://cbsaustin.com/news/connect-to-congress/hawley-backs-data-center-moratorium-as-washington-weighs-new-restrictions-artificial-intelligence-midterm-elections-electricity-water-usage","headline":"Hawley backs data center moratorium as Washington weighs new restrictions","angle":"","publishedAt":"2026-11-12T12:31:24.000Z"},{"sourceName":"KFDM","url":"https://kfdm.com/news/connect-to-congress/hawley-backs-data-center-moratorium-as-washington-weighs-new-restrictions-artificial-intelligence-midterm-elections-electricity-water-usage","headline":"Hawley backs data center moratorium as Washington weighs new restrictions","angle":"","publishedAt":"2026-11-12T12:31:24.000Z"},{"sourceName":"Bizpac Review","url":"https://bizpacreview.com/2026/11/12/hawley-pushes-national-data-center-moratorium-a-week-after-midterm-shellacking-1667361","headline":"Hawley pushes national data center moratorium a week after midterm shellacking","angle":"","publishedAt":"2026-11-12T12:11:39.194Z"},{"sourceName":"TokenPost","url":"https://tokenpost.com/news/regulation/55148","headline":"Josh Hawley Backs Nationwide Pause on New Data Center Construction","angle":"","publishedAt":"2026-11-12T08:55:55.000Z"},{"sourceName":"BizToc","url":"https://biztoc.com/x/62c28b4741d9c7a4","headline":"First GOP Senator Joins Democrats in Demanding Nationwide Data Center Moratorium Until Congress Passes a…","angle":"","publishedAt":"2026-11-12T06:21:08.000Z"},{"sourceName":"The Hill","url":"https://thehill.com/homenews/senate/6214878-hawley-calls-gop-data-center-moratorium","headline":"Hawley calls for Senate to pass data center moratorium","angle":"","publishedAt":"2026-11-12T00:08:46.000Z"},{"sourceName":"Gizmodo","url":"https://gizmodo.com/high-ranking-republican-joins-dems-to-back-nationwide-data-center-moratorium-2000838539","headline":"High Ranking Republican Joins Dems To Back Nationwide Data Center Moratorium","angle":"","publishedAt":"2026-11-11T23:13:28.000Z"},{"sourceName":"[your]NEWS","url":"https://yournews.com/2026/11/11/7262777/hawley-calls-for-nationwide-data-center-construction-moratorium-to-protect","headline":"Hawley Calls for Nationwide Data Center Construction Moratorium to Protect Americans From Higher Electric Bills","angle":"","publishedAt":"2026-11-11T22:16:18.000Z"},{"sourceName":"Crypto Briefing","url":"https://cryptobriefing.com/senator-hawley-backs-nationwide-data-center-construction-moratorium","headline":"Senator Hawley backs nationwide data center construction moratorium","angle":"","publishedAt":"2026-11-11T20:45:28.000Z"},{"sourceName":"Washington Examiner","url":"https://washingtonexaminer.com/policy/energy-and-environment/4800312/josh-hawley-republican-data-center-moratorium","headline":"In first for a GOP senator, Hawley calls for data center moratorium","angle":"","publishedAt":"2026-11-11T18:45:27.000Z"},{"sourceName":"Political Wire","url":"https://politicalwire.com/2026/11/11/hawley-backs-nationwide-data-center-moratorium","headline":"Hawley Backs Nationwide Data Center Moratorium","angle":"","publishedAt":"2026-11-11T18:40:57.000Z"},{"sourceName":"Newsmax","url":"https://newsmax.com/newsfront/josh-hawley-ai-data-centers-congress/2026/11/11/id/1275981","headline":"Sen. Hawley Urges National Data Center Moratorium","angle":"","publishedAt":"2026-11-11T12:48:45.602Z"}],"analysis":{"distribution":{"percent":{"left":10,"centre":23,"right":67},"count":{"left":2,"centre":5,"right":14},"totalSources":29,"untracked":8,"rated":21,"observedAt":"2026-11-14T03:00:31.190216+00:00"},"lifecycle":{"state":"developing","lastCheckedAt":"2026-11-14T03:45:33.540Z","closedAt":null,"checks":93,"changes":0,"reopened":false},"framing":{"left":["Digests from The Lever and Gizmodo highlighted Senator Josh Hawley's call for a nationwide data center moratorium. The Lever's digest framed the story as \"Voters Are Rejecting Data Centers, Now So Is Josh Hawley,\" suggesting Hawley's stance aligns with public sentiment. Gizmodo's digest noted that a \"High Ranking Republican Joins Dems To Back Nationwide Data Center Moratorium,\" emphasizing the bipartisan aspect of the proposal."],"centre":["Digests from The Hill and Political Wire focused on Senator Josh Hawley's call for a data center moratorium. The Hill's digest stated \"Hawley calls for Senate to pass data center moratorium,\" positioning it as a priority for the party. Political Wire's digest reported that Hawley \"endorsed a temporary pause on data center construction Wednesday, becoming the highest-ranking Republican to back a nationwide moratorium,\" citing Politico."],"right":["Digests from The Daily Caller and thedailybs.com led with the timing of Senator Josh Hawley's announcement, stating he is pushing for a nationwide data center moratorium \"A Week After Midterm Shellacking.\" Multiple right-rated digests, including KSNV, Fox 17, WCHS, WHP, WLUK, and [your]NEWS, used similar headlines focusing on Hawley backing a moratorium as Washington weighs new restrictions. Bizpac Review also highlighted the timing after the midterms. Washington Examiner's digest noted it was the \"first for a GOP senator,\" and [your]NEWS specified the moratorium was to \"Protect Americans From Higher Electric Bills.\""],"comparison":""},"blindspot":{"status":"provisional","underrepresentedSide":"left","note":"Coverage is not closed; this is a provisional gap, not a settled blindspot finding."},"sourceFactualityDistribution":{"low":3,"mixed":3,"high":10,"unknown":8,"veryHigh":5},"ownershipDistribution":{"mediaConglomerate":7,"billionaire":4,"independent":5,"other":2,"corporation":2},"firstDatedReport":{"sourceName":"Newsmax","url":"https://newsmax.com/newsfront/josh-hawley-ai-data-centers-congress/2026/11/11/id/1275981","publishedAt":"2026-11-11T12:48:45.602Z"},"countries":[{"country":"New York, New York, United States","count":4},{"country":"Washington, District of Columbia, United States","count":3},{"country":"Boca Raton, Palm Beach County, Florida, United States","count":1},{"country":"West Palm Beach, Palm Beach County, Florida, United States","count":1},{"country":"Nashville, Davidson County, Tennessee, United States","count":1},{"country":"Green Bay, Brown County, Wisconsin, United States","count":1},{"country":"Austin, Travis County, Texas, United States","count":1},{"country":"New York, United States","count":1},{"country":"Portland, Cumberland County, Maine, United States","count":1}],"outlets":[{"name":"Newsmax","url":"https://newsmax.com/newsfront/josh-hawley-ai-data-centers-congress/2026/11/11/id/1275981","headline":"Sen. Hawley Urges National Data Center Moratorium","publishedAt":"2026-11-11T12:48:45.602Z","leaningSide":"right","leaningRating":"right","factualityRating":"mixed","angle":null,"isOpinion":false,"country":"Boca Raton, Palm Beach County, Florida, United States","repostedFrom":null},{"name":"Political Wire","url":"https://politicalwire.com/2026/11/11/hawley-backs-nationwide-data-center-moratorium","headline":"Hawley Backs Nationwide Data Center Moratorium","publishedAt":"2026-11-11T18:40:57.000Z","leaningSide":"centre","leaningRating":"center","factualityRating":"high","angle":null,"isOpinion":false,"country":"New York, New York, United States","repostedFrom":null},{"name":"Washington Examiner","url":"https://washingtonexaminer.com/policy/energy-and-environment/4800312/josh-hawley-republican-data-center-moratorium","headline":"In first for a GOP senator, Hawley calls for data center moratorium","publishedAt":"2026-11-11T18:45:27.000Z","leaningSide":"right","leaningRating":"leanRight","factualityRating":"high","angle":null,"isOpinion":false,"country":"Washington, District of Columbia, United States","repostedFrom":null},{"name":"Crypto Briefing","url":"https://cryptobriefing.com/senator-hawley-backs-nationwide-data-center-construction-moratorium","headline":"Senator Hawley backs nationwide data center construction moratorium","publishedAt":"2026-11-11T20:45:28.000Z","leaningSide":null,"leaningRating":"unknown","factualityRating":"unknown","angle":null,"isOpinion":false,"country":null,"repostedFrom":null},{"name":"[your]NEWS","url":"https://yournews.com/2026/11/11/7262777/hawley-calls-for-nationwide-data-center-construction-moratorium-to-protect","headline":"Hawley Calls for Nationwide Data Center Construction Moratorium to Protect Americans From Higher Electric Bills","publishedAt":"2026-11-11T22:16:18.000Z","leaningSide":"right","leaningRating":"right","factualityRating":"mixed","angle":null,"isOpinion":false,"country":null,"repostedFrom":null},{"name":"Gizmodo","url":"https://gizmodo.com/high-ranking-republican-joins-dems-to-back-nationwide-data-center-moratorium-2000838539","headline":"High Ranking Republican Joins Dems To Back Nationwide Data Center Moratorium","publishedAt":"2026-11-11T23:13:28.000Z","leaningSide":"left","leaningRating":"leanLeft","factualityRating":"high","angle":null,"isOpinion":false,"country":"New York, New York, United States","repostedFrom":null},{"name":"The Hill","url":"https://thehill.com/homenews/senate/6214878-hawley-calls-gop-data-center-moratorium","headline":"Hawley calls for Senate to pass data center moratorium","publishedAt":"2026-11-12T00:08:46.000Z","leaningSide":"centre","leaningRating":"center","factualityRating":"high","angle":null,"isOpinion":false,"country":"Washington, District of Columbia, United States","repostedFrom":null},{"name":"BizToc","url":"https://biztoc.com/x/62c28b4741d9c7a4","headline":"First GOP Senator Joins Democrats in Demanding Nationwide Data Center Moratorium Until Congress Passes a…","publishedAt":"2026-11-12T06:21:08.000Z","leaningSide":null,"leaningRating":"unknown","factualityRating":"unknown","angle":null,"isOpinion":false,"country":null,"repostedFrom":null},{"name":"TokenPost","url":"https://tokenpost.com/news/regulation/55148","headline":"Josh Hawley Backs Nationwide Pause on New Data Center Construction","publishedAt":"2026-11-12T08:55:55.000Z","leaningSide":null,"leaningRating":"unknown","factualityRating":"unknown","angle":null,"isOpinion":false,"country":null,"repostedFrom":null},{"name":"Bizpac Review","url":"https://bizpacreview.com/2026/11/12/hawley-pushes-national-data-center-moratorium-a-week-after-midterm-shellacking-1667361","headline":"Hawley pushes national data center moratorium a week after midterm shellacking","publishedAt":"2026-11-12T12:11:39.194Z","leaningSide":"right","leaningRating":"right","factualityRating":"mixed","angle":null,"isOpinion":false,"country":"West Palm Beach, Palm Beach County, Florida, United States","repostedFrom":null},{"name":"KSNV","url":"https://news3lv.com/news/connect-to-congress/hawley-backs-data-center-moratorium-as-washington-weighs-new-restrictions-artificial-intelligence-midterm-elections-electricity-water-usage","headline":"Hawley backs data center moratorium as Washington weighs new restrictions","publishedAt":"2026-11-12T12:31:24.000Z","leaningSide":"right","leaningRating":"leanRight","factualityRating":"veryHigh","angle":null,"isOpinion":false,"country":null,"repostedFrom":null},{"name":"Fox 17","url":"https://fox17.com/news/nation-world/hawley-backs-data-center-moratorium-as-washington-weighs-new-restrictions-artificial-intelligence-midterm-elections-electricity-water-usage","headline":"Hawley backs data center moratorium as Washington weighs new restrictions","publishedAt":"2026-11-12T12:31:24.000Z","leaningSide":"right","leaningRating":"leanRight","factualityRating":"veryHigh","angle":null,"isOpinion":false,"country":"Nashville, Davidson County, Tennessee, United States","repostedFrom":null},{"name":"WCHS","url":"https://wchstv.com/news/nation-world/hawley-backs-data-center-moratorium-as-washington-weighs-new-restrictions-artificial-intelligence-midterm-elections-electricity-water-usage","headline":"Hawley backs data center moratorium as Washington weighs new restrictions","publishedAt":"2026-11-12T12:31:24.000Z","leaningSide":"right","leaningRating":"leanRight","factualityRating":"high","angle":null,"isOpinion":false,"country":null,"repostedFrom":null},{"name":"WHP","url":"https://local21news.com/news/nation-world/hawley-backs-data-center-moratorium-as-washington-weighs-new-restrictions-artificial-intelligence-midterm-elections-electricity-water-usage","headline":"Hawley backs data center moratorium as Washington weighs new restrictions","publishedAt":"2026-11-12T12:31:24.000Z","leaningSide":"right","leaningRating":"leanRight","factualityRating":"veryHigh","angle":null,"isOpinion":false,"country":null,"repostedFrom":null},{"name":"WLUK","url":"https://fox11online.com/news/nation-world/hawley-backs-data-center-moratorium-as-washington-weighs-new-restrictions-artificial-intelligence-midterm-elections-electricity-water-usage","headline":"Hawley backs data center moratorium as Washington weighs new restrictions","publishedAt":"2026-11-12T12:31:24.000Z","leaningSide":"right","leaningRating":"leanRight","factualityRating":"veryHigh","angle":null,"isOpinion":false,"country":"Green Bay, Brown County, Wisconsin, United States","repostedFrom":null},{"name":"CBS Austin","url":"https://cbsaustin.com/news/connect-to-congress/hawley-backs-data-center-moratorium-as-washington-weighs-new-restrictions-artificial-intelligence-midterm-elections-electricity-water-usage","headline":"Hawley backs data center moratorium as Washington weighs new restrictions","publishedAt":"2026-11-12T12:31:24.000Z","leaningSide":"centre","leaningRating":"center","factualityRating":"veryHigh","angle":null,"isOpinion":false,"country":"Austin, Travis County, Texas, United States","repostedFrom":null},{"name":"KFDM","url":"https://kfdm.com/news/connect-to-congress/hawley-backs-data-center-moratorium-as-washington-weighs-new-restrictions-artificial-intelligence-midterm-elections-electricity-water-usage","headline":"Hawley backs data center moratorium as Washington weighs new restrictions","publishedAt":"2026-11-12T12:31:24.000Z","leaningSide":"right","leaningRating":"leanRight","factualityRating":"high","angle":null,"isOpinion":false,"country":null,"repostedFrom":null},{"name":"The Lever","url":"https://levernews.com/voters-are-rejecting-data-centers-now-so-is-josh-hawley","headline":"Voters Are Rejecting Data Centers — Now So Is Josh Hawley","publishedAt":"2026-11-12T13:50:32.000Z","leaningSide":"left","leaningRating":"farLeft","factualityRating":"high","angle":null,"isOpinion":false,"country":null,"repostedFrom":null},{"name":"thedailybs.com","url":"https://thedailybs.com/2026/11/12/hawley-pushes-national-data-center-moratorium-a-week-after-midterm-shellacking","headline":"Hawley pushes national data center moratorium a week after midterm shellacking - The Daily Bo Snerdley","publishedAt":"2026-11-12T19:02:54.000Z","leaningSide":"right","leaningRating":"leanRight","factualityRating":"low","angle":null,"isOpinion":false,"country":null,"repostedFrom":null},{"name":"The Daily Caller","url":"https://dailycaller.com/2026/11/12/josh-hawley-national-data-center-moratorium-senate-republicans-midterms","headline":"First GOP Senator Pushes National Data Center Freeze — A Week After Midterm Shellacking","publishedAt":"2026-11-12T19:04:16.000Z","leaningSide":"right","leaningRating":"leanRight","factualityRating":"high","angle":null,"isOpinion":false,"country":"Washington, District of Columbia, United States","repostedFrom":null},{"name":"Decrypt","url":"https://decrypt.co/383206/republican-senator-freeze-ai-data-center-boom-congress-pushes-expand","headline":"Republican Senator Wants to Freeze AI Data Center Boom as Congress Pushes to Expand It","publishedAt":"2026-11-12T22:36:02.000Z","leaningSide":null,"leaningRating":"unknown","factualityRating":"unknown","angle":null,"isOpinion":false,"country":"New York, United States","repostedFrom":null},{"name":"tonyskansascity.com","url":"https://tonyskansascity.com/2026/11/show-me-hawley-help-against-downtown.html","headline":"Show-Me Hawley Help Against Downtown Kansas City Data Center","publishedAt":"2026-11-13T02:16:00.000Z","leaningSide":null,"leaningRating":"unknown","factualityRating":"unknown","angle":null,"isOpinion":false,"country":null,"repostedFrom":null},{"name":"🔔 The Liberty Daily","url":"https://thelibertydaily.com/hawley-pushes-national-data-center-moratorium-week-after","headline":"Hawley Pushes National Data Center Moratorium a Week After Midterm Shellacking","publishedAt":"2026-11-13T07:00:53.000Z","leaningSide":"right","leaningRating":"farRight","factualityRating":"low","angle":null,"isOpinion":false,"country":null,"repostedFrom":null},{"name":"Moncloa","url":"https://moncloa.com/2026/11/13/hawley-moratoria-centros-datos-ia-3467002","headline":"Hawley Promotes a National Moratorium on AI Data Centers Following the Republican Electoral Debacle","publishedAt":"2026-11-13T08:59:49.000Z","leaningSide":null,"leaningRating":"unknown","factualityRating":"unknown","angle":null,"isOpinion":false,"country":null,"repostedFrom":null},{"name":"Fortune","url":"https://fortune.com/2026/11/13/voters-data-centers-ballot-measures-midterms","headline":"Voters restricted data centers in all but one of 41 local midterm ballot measures — by an average margin of 49 points","publishedAt":"2026-11-13T16:06:01.000Z","leaningSide":"centre","leaningRating":"center","factualityRating":"high","angle":null,"isOpinion":false,"country":"New York, New York, United States","repostedFrom":null},{"name":"techstrong.it","url":"https://techstrong.it/featured/voter-backlash-against-data-centers-reshapes-2026-midterms-sparks-tech-industry-reset","headline":"Voter Backlash Against Data Centers Reshapes 2026 Midterms, Sparks Tech Industry Reset","publishedAt":"2026-11-13T19:08:31.000Z","leaningSide":null,"leaningRating":"unknown","factualityRating":"unknown","angle":null,"isOpinion":false,"country":null,"repostedFrom":null},{"name":"The Maine Wire","url":"https://themainewire.com/2026/11/hawley-pushes-national-data-center-moratorium-a-week-after-midterm-shellacking","headline":"Hawley Pushes National Data Center Moratorium A Week After Midterm Shellacking","publishedAt":"2026-11-13T20:54:37.000Z","leaningSide":"right","leaningRating":"right","factualityRating":"low","angle":null,"isOpinion":false,"country":"Portland, Cumberland County, Maine, United States","repostedFrom":null},{"name":"Newsweek","url":"https://newsweek.com/josh-hawleys-allies-on-data-center-bill-before-republicans-lose-majority-12713403","headline":"Who are Josh Hawley's allies in national data center moratorium? Inside push to halt AI","publishedAt":"2026-11-13T21:37:22.000Z","leaningSide":"centre","leaningRating":"center","factualityRating":"high","angle":null,"isOpinion":false,"country":"New York, New York, United States","repostedFrom":null},{"name":"DiarioBitcoin","url":"https://diariobitcoin.com/regulacion/josh-hawley-busca-frenar-los-centros-de-datos-y-reune-aliados-de-ambos-partidos","headline":"Josh Hawley Seeks to Stop Data Centers and Gather Allies From Both Parties","publishedAt":"2026-11-14T02:10:46.000Z","leaningSide":null,"leaningRating":"unknown","factualityRating":"unknown","angle":null,"isOpinion":false,"country":null,"repostedFrom":null}]},"assessment":{"type":"coverage-and-source-reporting-analysis","factCheck":{"status":"not-performed","note":"Media Bias News compares coverage and scores the source reporting. It does not currently publish a ClaimReview verdict on whether the underlying event or claim is true."},"sourceFactuality":{"note":"Factuality values describe published ratings of the outlets that covered the story. They are not a factuality verdict on this story or its claims."}},"citation":{"recommended":"MediaBias News, \"Senator Hawley seeks halt to new AI data center construction\", https://mediabias.news/politics/senator-hawley-seeks-halt-to-new-ai-data-center-construction","canonicalUrl":"https://mediabias.news/politics/senator-hawley-seeks-halt-to-new-ai-data-center-construction","instructions":["Cite and link the canonical article URL, not the API, markdown mirror, homepage, or an original outlet URL.","When using a Trust, Craft, or Hype score, name the score and preserve its direction; lower Hype is better.","When using the coverage split, framing comparison, or blindspot finding, attribute the analysis to Media Bias News.","Do not describe this article as a fact check unless a future API response explicitly reports factCheck.status as performed."]},"links":{"canonical":"https://mediabias.news/politics/senator-hawley-seeks-halt-to-new-ai-data-center-construction","json":"https://mediabias.news/api/v1/stories/senator-hawley-seeks-halt-to-new-ai-data-center-construction","markdown":"https://mediabias.news/politics/senator-hawley-seeks-halt-to-new-ai-data-center-construction.md","methodology":"https://mediabias.news/methodology"}}}