{"publisher":{"name":"MediaBias News","url":"https://mediabias.news","methodology":"https://mediabias.news/methodology","editorialPrinciples":"https://mediabias.news/editorial-principles","corrections":"https://mediabias.news/corrections"},"scoreGuide":{"trust":"How well corroborated and evidenced the source reporting is. 0-100, higher is better.","critic":"Craft quality of the source journalism: context, balance, fact vs comment. 0-100, higher is better.","hype":"How far the source presentation runs ahead of substance. 0-100, LOWER IS BETTER.","scope":"Scores assess the original reporting this article was written from, not the truth of the underlying event and not the quality of this write-up."},"assessmentGuide":{"type":"coverage-and-source-reporting-analysis","factCheck":{"status":"not-performed","note":"Media Bias News compares coverage and scores the source reporting. It does not currently publish a ClaimReview verdict on whether the underlying event or claim is true."},"sourceFactuality":{"note":"Factuality values describe published ratings of the outlets that covered the story. They are not a factuality verdict on this story or its claims."}},"story":{"id":"https://mediabias.news/business/trans-mountain-pipeline-flow-increase-project-completed-ahead-of-schedule","slug":"trans-mountain-pipeline-flow-increase-project-completed-ahead-of-schedule","url":"https://mediabias.news/business/trans-mountain-pipeline-flow-increase-project-completed-ahead-of-schedule","title":"Trans Mountain pipeline flow increase project completed ahead of schedule","subtitle":"Chemical additives have boosted the pipeline's capacity, with further expansion planned by 2028.","excerpt":"A project to increase crude oil flow on the Trans Mountain Pipeline has finished two months early. The pipeline's capacity has been increased by up to 10 per cent, with further expansion planned by the end of 2028.","category":"Business & Economy","area":null,"publishedAt":"2026-11-27T23:46:10.826Z","sourceReportedAt":"2026-11-27T21:07:14.000Z","updatedAt":"2026-11-27T23:46:10.826Z","readTime":"3 min read","scores":{"trust":60,"critic":60,"hype":20,"notes":{"trust":"Two full reports and 12 digests corroborate the central claim, with specific figures provided.","critic":"Reporting is clear and holds together, with most outlets providing context and financial details.","hype":"Headlines are factual and do not overstate the substance of the reporting."}},"tags":["#TransMountainPipeline","#Energy","#Oil","#Infrastructure","#Business"],"entities":["Trans Mountain Corporation","Federal Government","Kinder Morgan Canada","Lauren Krugel","St’at’imc Chiefs Council"],"body":[{"type":"key_takeaways","items":["A project to increase crude oil flow on the Trans Mountain Pipeline using chemical additives is complete, two months ahead of schedule.","The pipeline's capacity has risen by up to 10 per cent, reaching 980,000 barrels per day.","Trans Mountain reported net income of $132 million for the third quarter, up from $127 million in the same period last year.","A further expansion is planned to add 210,000 barrels per day by the end of 2028."]},{"type":"paragraph","text":"A project designed to increase the volume of crude oil transported through the Trans Mountain Pipeline has been finished two months earlier than anticipated. The use of a drag-reducing agent has boosted the pipeline's capacity by approximately 10 per cent, allowing it to carry up to 980,000 barrels of oil per day. The pipeline transports oil from the Edmonton area to Burnaby, British Columbia. Trans Mountain reported that during the third quarter, it shipped an average of 840,000 barrels per day. The company's net income for the quarter increased to $132 million from $127 million, with revenues rising to $825 million from $765 million."},{"type":"paragraph","text":"A further expansion of the pipeline, which will involve new pipeline segments and pump stations, is scheduled to become operational by the end of 2028. This expansion is expected to add another 210,000 barrels per day, bringing the system's total capacity to 1.19 million barrels daily. Approximately 60 per cent of the oil transported during the third quarter was sent to the Westridge Marine Terminal for shipment to Asian markets, with the remainder delivered to points in British Columbia and Washington state. The Crown corporation also noted that it has paid $1.45 billion to the federal government in interest payments, dividends, and return of capital distributions so far this year, with $551 million paid in the third quarter."},{"type":"heading","text":"Disagreement on future capacity figure"},{"type":"paragraph","text":"While most reports state that a further expansion will bring the system's total capacity to 1.19 million barrels a day, Global News reported this figure as 1.19 billion barrels a day."},{"type":"heading","text":"What the coverage left out"},{"type":"paragraph","text":"None of the left-rated digests mention the total cost of the expanded pipeline, which was reported as more than $34 billion by CTV News and Global News. The right-rated digest does not mention the financial results for the third quarter, the historical context of the pipeline's purchase by the federal government, or the planned future expansion."}],"basedOn":[{"sourceName":"The Epoch Times","url":"https://theepochtimes.com/world/project-to-increase-trans-mountain-pipeline-flows-starts-up-ahead-of-schedule-6130242","headline":"Project to Increase Trans Mountain Pipeline Flows Starts up Ahead of Schedule","angle":"","publishedAt":"2026-11-27T21:07:14.000Z"},{"sourceName":"The Turtle Island News","url":"https://theturtleislandnews.com/index.php/2026/11/27/project-to-increase-trans-mountain-pipeline-flows-starts-up-ahead-of-schedule","headline":"Project to increase Trans Mountain pipeline flows starts up ahead of schedule","angle":"","publishedAt":"2026-11-27T19:13:49.000Z"},{"sourceName":"CTV News","url":"https://ctvnews.ca/business/article/project-to-increase-trans-mountain-pipeline-flows-starts-up-ahead-of-schedule","headline":"Alberta-to-B.C. pipeline project to increase flow has been completed","angle":"","publishedAt":"2026-11-27T18:54:40.444Z"},{"sourceName":"CFJC Today Kamloops","url":"https://cfjctoday.com/2026/11/27/project-to-increase-trans-mountain-pipeline-flows-starts-up-ahead-of-schedule","headline":"Project to increase Trans Mountain pipeline flows starts up ahead of schedule","angle":"","publishedAt":"2026-11-27T18:45:54.000Z"},{"sourceName":"Ckpg Today","url":"https://ckpgtoday.ca/2026/11/27/project-to-increase-trans-mountain-pipeline-flows-starts-up-ahead-of-schedule","headline":"Project to increase Trans Mountain pipeline flows starts up ahead of schedule","angle":"","publishedAt":"2026-11-27T18:45:54.000Z"},{"sourceName":"The Globe & Mail","url":"https://theglobeandmail.com/business/article-project-to-boost-trans-mountain-pipeline-flows-starts-up","headline":"Project to boost Trans Mountain pipeline flows starts up ahead of schedule","angle":"","publishedAt":"2026-11-27T18:45:15.261Z"},{"sourceName":"BizToc","url":"https://biztoc.com/x/54cb17bb3af290c2","headline":"Project to boost Trans Mountain pipeline flows starts up ahead of schedule","angle":"","publishedAt":"2026-11-27T18:45:15.000Z"},{"sourceName":"The Toronto Star","url":"https://thestar.com/business/project-to-increase-trans-mountain-pipeline-flows-starts-up-ahead-of-schedule/article_5e31c31c-42dd-579f-9918-b9f0081e1d12.html","headline":"Project to increase Trans Mountain pipeline flows starts up ahead of schedule","angle":"","publishedAt":"2026-11-27T16:20:25.000Z"},{"sourceName":"Rocky Mountain Outlook","url":"https://rmoutlook.com/national-business/project-to-increase-trans-mountain-pipeline-flows-starts-up-ahead-of-schedule-13067019","headline":"Project to increase Trans Mountain pipeline flows starts up ahead of schedule","angle":"","publishedAt":"2026-11-27T16:20:25.000Z"},{"sourceName":"City News","url":"https://vancouver.citynews.ca/2026/11/27/project-to-increase-trans-mountain-pipeline-flows-starts-up-ahead-of-schedule","headline":"Project to increase Trans Mountain pipeline flows starts up ahead of schedule","angle":"","publishedAt":"2026-11-27T16:20:25.000Z"},{"sourceName":"Global News","url":"https://globalnews.ca/news/12169033/trans-mountain-pipeline-flow-increase","headline":"Project to increase Trans Mountain pipeline flows starts up ahead of schedule","angle":"","publishedAt":"2026-11-27T14:20:37.000Z"},{"sourceName":"Winnipeg Free Press","url":"https://winnipegfreepress.com/business/2026/11/27/project-to-increase-trans-mountain-pipeline-flows-starts-up-ahead-of-schedule","headline":"Project to increase Trans Mountain pipeline flows starts up ahead of schedule","angle":"","publishedAt":"2026-11-27T11:20:25.000Z"},{"sourceName":"The Hamilton Spectator","url":"https://thespec.com/business/project-to-increase-trans-mountain-pipeline-flows-starts-up-ahead-of-schedule/article_f4c2566c-4c9c-57ec-b717-61fc40e9cd05.html","headline":"Project to increase Trans Mountain pipeline flows starts up ahead of schedule","angle":"","publishedAt":"2026-11-27T11:20:25.000Z"},{"sourceName":"The Record","url":"https://therecord.com/business/project-to-increase-trans-mountain-pipeline-flows-starts-up-ahead-of-schedule/article_bc822f80-1a8f-5cde-8168-9b05f5f031b5.html","headline":"Project to increase Trans Mountain pipeline flows starts up ahead of schedule","angle":"","publishedAt":"2026-11-27T11:20:25.000Z"}],"analysis":{"distribution":{"percent":{"left":46,"centre":46,"right":8},"count":{"left":6,"centre":6,"right":1},"totalSources":14,"untracked":1,"rated":13,"observedAt":"2026-11-27T23:45:11.202401+00:00"},"lifecycle":{"state":"developing","lastCheckedAt":"2026-11-28T00:15:12.591Z","closedAt":null,"checks":2,"changes":0,"reopened":false},"framing":{"left":["Left-rated reports highlighted the completion of the project ahead of schedule and the increase in pipeline capacity. Several reports mentioned the financial results for the third quarter, including net income and revenues. The previous purchase of the pipeline by the federal government for $4.5 billion in 2018, after Kinder Morgan Canada withdrew, was noted by Global News and The Turtle Island News. Global News and The Turtle Island News also included details about the ongoing legal challenges against the proposed Pacific Link pipeline, with Global News specifically mentioning that at least 17 First Nations and one U.S. tribe have filed legal challenges."],"centre":["Centre-rated reports focused on the operational aspects of the Trans Mountain Pipeline, detailing the completion of the project to increase flow using chemical additives two months early. The increase in capacity to 980,000 barrels per day was consistently reported. Financial figures for the third quarter, including net income and revenues, were also a common feature. CTV News and Global News (which is rated left but included in this section due to its full report) provided context on the pipeline's history, including its purchase by the federal government and the cost of the expanded pipeline. They also mentioned the planned future expansion by 2028 and the proportion of oil shipped to the Westridge Marine Terminal."],"right":["The single right-rated report, The Epoch Times, focused on the completion of the project to increase Trans Mountain pipeline flows ahead of schedule. The digest stated that the project to increase crude oil flow using chemical additives was finished two months early."],"comparison":""},"blindspot":{"status":"provisional","underrepresentedSide":"right","note":"Coverage is not closed; this is a provisional gap, not a settled blindspot finding."},"sourceFactualityDistribution":{"high":6,"unknown":1,"veryHigh":7},"ownershipDistribution":{"telecom":1,"privateEquity":2,"mediaConglomerate":4,"independent":1,"corporation":1},"firstDatedReport":{"sourceName":"Winnipeg Free Press","url":"https://winnipegfreepress.com/business/2026/11/27/project-to-increase-trans-mountain-pipeline-flows-starts-up-ahead-of-schedule","publishedAt":"2026-11-27T11:20:25.000Z"},"countries":[{"country":"Toronto, Ontario, Canada, Canada","count":5},{"country":"Winnipeg, Manitoba, Canada","count":1},{"country":"Hamilton, Ontario, Canada","count":1},{"country":"Woodland Park, Passaic County, New Jersey, United States","count":1},{"country":"Canmore, Bighorn No. 8, Alberta, Canada","count":1},{"country":"Prince George, Fraser-Fort George, British Columbia, Canada","count":1},{"country":"New York, New York, United States","count":1}],"outlets":[{"name":"Winnipeg Free Press","url":"https://winnipegfreepress.com/business/2026/11/27/project-to-increase-trans-mountain-pipeline-flows-starts-up-ahead-of-schedule","headline":"Project to increase Trans Mountain pipeline flows starts up ahead of schedule","publishedAt":"2026-11-27T11:20:25.000Z","leaningSide":"centre","leaningRating":"center","factualityRating":"veryHigh","angle":null,"isOpinion":false,"country":"Winnipeg, Manitoba, Canada","repostedFrom":"The Toronto Star"},{"name":"The Hamilton Spectator","url":"https://thespec.com/business/project-to-increase-trans-mountain-pipeline-flows-starts-up-ahead-of-schedule/article_f4c2566c-4c9c-57ec-b717-61fc40e9cd05.html","headline":"Project to increase Trans Mountain pipeline flows starts up ahead of schedule","publishedAt":"2026-11-27T11:20:25.000Z","leaningSide":"left","leaningRating":"leanLeft","factualityRating":"high","angle":null,"isOpinion":false,"country":"Hamilton, Ontario, Canada","repostedFrom":"The Toronto Star"},{"name":"The Record","url":"https://therecord.com/business/project-to-increase-trans-mountain-pipeline-flows-starts-up-ahead-of-schedule/article_bc822f80-1a8f-5cde-8168-9b05f5f031b5.html","headline":"Project to increase Trans Mountain pipeline flows starts up ahead of schedule","publishedAt":"2026-11-27T11:20:25.000Z","leaningSide":"left","leaningRating":"leanLeft","factualityRating":"high","angle":null,"isOpinion":false,"country":"Woodland Park, Passaic County, New Jersey, United States","repostedFrom":"The Toronto Star"},{"name":"Global News","url":"https://globalnews.ca/news/12169033/trans-mountain-pipeline-flow-increase","headline":"Project to increase Trans Mountain pipeline flows starts up ahead of schedule","publishedAt":"2026-11-27T14:20:37.000Z","leaningSide":"left","leaningRating":"leanLeft","factualityRating":"veryHigh","angle":null,"isOpinion":false,"country":"Toronto, Ontario, Canada, Canada","repostedFrom":"The Toronto Star"},{"name":"The Toronto Star","url":"https://thestar.com/business/project-to-increase-trans-mountain-pipeline-flows-starts-up-ahead-of-schedule/article_5e31c31c-42dd-579f-9918-b9f0081e1d12.html","headline":"Project to increase Trans Mountain pipeline flows starts up ahead of schedule","publishedAt":"2026-11-27T16:20:25.000Z","leaningSide":"left","leaningRating":"leanLeft","factualityRating":"high","angle":null,"isOpinion":false,"country":"Toronto, Ontario, Canada, Canada","repostedFrom":null},{"name":"Rocky Mountain Outlook","url":"https://rmoutlook.com/national-business/project-to-increase-trans-mountain-pipeline-flows-starts-up-ahead-of-schedule-13067019","headline":"Project to increase Trans Mountain pipeline flows starts up ahead of schedule","publishedAt":"2026-11-27T16:20:25.000Z","leaningSide":"left","leaningRating":"leanLeft","factualityRating":"veryHigh","angle":null,"isOpinion":false,"country":"Canmore, Bighorn No. 8, Alberta, Canada","repostedFrom":"The Toronto Star"},{"name":"City News","url":"https://vancouver.citynews.ca/2026/11/27/project-to-increase-trans-mountain-pipeline-flows-starts-up-ahead-of-schedule","headline":"Project to increase Trans Mountain pipeline flows starts up ahead of schedule","publishedAt":"2026-11-27T16:20:25.000Z","leaningSide":"centre","leaningRating":"center","factualityRating":"veryHigh","angle":null,"isOpinion":false,"country":"Toronto, Ontario, Canada, Canada","repostedFrom":null},{"name":"BizToc","url":"https://biztoc.com/x/54cb17bb3af290c2","headline":"Project to boost Trans Mountain pipeline flows starts up ahead of schedule","publishedAt":"2026-11-27T18:45:15.000Z","leaningSide":null,"leaningRating":"unknown","factualityRating":"unknown","angle":null,"isOpinion":false,"country":null,"repostedFrom":"The Globe & Mail"},{"name":"The Globe & Mail","url":"https://theglobeandmail.com/business/article-project-to-boost-trans-mountain-pipeline-flows-starts-up","headline":"Project to boost Trans Mountain pipeline flows starts up ahead of schedule","publishedAt":"2026-11-27T18:45:15.261Z","leaningSide":"centre","leaningRating":"center","factualityRating":"veryHigh","angle":null,"isOpinion":false,"country":"Toronto, Ontario, Canada, Canada","repostedFrom":null},{"name":"CFJC Today Kamloops","url":"https://cfjctoday.com/2026/11/27/project-to-increase-trans-mountain-pipeline-flows-starts-up-ahead-of-schedule","headline":"Project to increase Trans Mountain pipeline flows starts up ahead of schedule","publishedAt":"2026-11-27T18:45:54.000Z","leaningSide":"centre","leaningRating":"center","factualityRating":"high","angle":null,"isOpinion":false,"country":null,"repostedFrom":null},{"name":"Ckpg Today","url":"https://ckpgtoday.ca/2026/11/27/project-to-increase-trans-mountain-pipeline-flows-starts-up-ahead-of-schedule","headline":"Project to increase Trans Mountain pipeline flows starts up ahead of schedule","publishedAt":"2026-11-27T18:45:54.000Z","leaningSide":"centre","leaningRating":"center","factualityRating":"veryHigh","angle":null,"isOpinion":false,"country":"Prince George, Fraser-Fort George, British Columbia, Canada","repostedFrom":null},{"name":"CTV News","url":"https://ctvnews.ca/business/article/project-to-increase-trans-mountain-pipeline-flows-starts-up-ahead-of-schedule","headline":"Alberta-to-B.C. pipeline project to increase flow has been completed","publishedAt":"2026-11-27T18:54:40.444Z","leaningSide":"centre","leaningRating":"center","factualityRating":"veryHigh","angle":null,"isOpinion":false,"country":"Toronto, Ontario, Canada, Canada","repostedFrom":null},{"name":"The Turtle Island News","url":"https://theturtleislandnews.com/index.php/2026/11/27/project-to-increase-trans-mountain-pipeline-flows-starts-up-ahead-of-schedule","headline":"Project to increase Trans Mountain pipeline flows starts up ahead of schedule","publishedAt":"2026-11-27T19:13:49.000Z","leaningSide":"left","leaningRating":"leanLeft","factualityRating":"high","angle":null,"isOpinion":false,"country":null,"repostedFrom":null},{"name":"The Epoch Times","url":"https://theepochtimes.com/world/project-to-increase-trans-mountain-pipeline-flows-starts-up-ahead-of-schedule-6130242","headline":"Project to Increase Trans Mountain Pipeline Flows Starts up Ahead of Schedule","publishedAt":"2026-11-27T21:07:14.000Z","leaningSide":"right","leaningRating":"leanRight","factualityRating":"high","angle":null,"isOpinion":false,"country":"New York, New York, United States","repostedFrom":"The Toronto Star"}]},"assessment":{"type":"coverage-and-source-reporting-analysis","factCheck":{"status":"not-performed","note":"Media Bias News compares coverage and scores the source reporting. It does not currently publish a ClaimReview verdict on whether the underlying event or claim is true."},"sourceFactuality":{"note":"Factuality values describe published ratings of the outlets that covered the story. They are not a factuality verdict on this story or its claims."}},"citation":{"recommended":"MediaBias News, \"Trans Mountain pipeline flow increase project completed ahead of schedule\", https://mediabias.news/business/trans-mountain-pipeline-flow-increase-project-completed-ahead-of-schedule","canonicalUrl":"https://mediabias.news/business/trans-mountain-pipeline-flow-increase-project-completed-ahead-of-schedule","instructions":["Cite and link the canonical article URL, not the API, markdown mirror, homepage, or an original outlet URL.","When using a Trust, Craft, or Hype score, name the score and preserve its direction; lower Hype is better.","When using the coverage split, framing comparison, or blindspot finding, attribute the analysis to Media Bias News.","Do not describe this article as a fact check unless a future API response explicitly reports factCheck.status as performed."]},"links":{"canonical":"https://mediabias.news/business/trans-mountain-pipeline-flow-increase-project-completed-ahead-of-schedule","json":"https://mediabias.news/api/v1/stories/trans-mountain-pipeline-flow-increase-project-completed-ahead-of-schedule","markdown":"https://mediabias.news/business/trans-mountain-pipeline-flow-increase-project-completed-ahead-of-schedule.md","methodology":"https://mediabias.news/methodology"}}}